Understand the scope
What is this process for?
The business permit and building permit are distinct from the commodo aspect. Several decisions may be required before construction or operation.
In your file
How to prepare the process
Describe the activity, equipment, capacities and potential nuisances in order to determine the relevant class. Prepare the required plans and studies, then identify the applicable authority and procedure. The conditions of the permit must be complied with during operation. An extension or modification may require an update to the file.
A scenario to help you understand
Educational example
An operator plans a workshop with machinery and storage. They check the classification and permits before commissioning the facilities.
Fictitious situation, presented to illustrate the concept.Prepare for what comes next
Points to check
- Déterminer la classe de l’installation
- Préparer le dossier technique
- Suivre les prescriptions et modifications
Connecting concepts
Terms to know as well
Continue with the concepts, contacts and procedures related to this topic.
Put it into practice
Explore further with our guides
Sources and verification
References consulted on 20 September 2026. Official procedures specify the applicable conditions and exceptions.
This guide explains a general process. The applicable rules depend on your situation; it does not constitute personalised advice. Report a correction.
A definition gives you a reference point. To examine your situation, clarify your question with a professional.