Understand the scope
Its role for your business
The need for a procedure depends on the project and its location. A building permit or another authorisation should not be regarded as automatically covering water-related aspects.
In your file
When to contact them and what to prepare
Prepare plans, technical descriptions and information on the relevant flows. Also review the requirements and validity period of decisions obtained. Any change to the project must be assessed against the authorised conditions. The application must follow the procedure specified by the competent authority.
A scenario to help you understand
Educational example
A company is developing a site and planning discharges: it has the water-related aspects checked in parallel with the other required authorisations.
Fictitious situation, presented to illustrate the concept.Prepare for what comes next
Points to check
- Identifier les impacts sur l’eau
- Préparer les pièces techniques
- Suivre les prescriptions de l’autorisation
Connecting concepts
Terms to know as well
Continue with the concepts, contacts and procedures related to this topic.
Put it into practice
Explore further with our guides
Sources and verification
References consulted on 20 September 2026. Official procedures specify the applicable conditions and exceptions.
This guide explains a general process. The applicable rules depend on your situation; it does not constitute personalised advice. Report a correction.
A definition gives you a reference point. To examine your situation, clarify your question with a professional.